Grand Avenue Lighting

The $28.6M two-year makeover of Main Avenue in downtown Fargo was a joint project between the NDDOT and City of Fargo to transform Main Avenue into a safe and accessible passageway into the heart of downtown. Theproject improved the 50-60 year old aging infrastructure and an aging driving surface while improving the pedestrian experience through the downtown corridor. Work included repaved roads that provided a smoother driving surface and improved drainage. The installation of traffic signals, pedestrian crossing signals, bridge, and street lighting starting at I-35 and running nearly 4.8 miles along Grand Avenue for greater accessibility and safety to pedestrians in the area.

Scope of Work

Our scope of work included all civil, electrical, and distribution systems required for the signals and street lighting.