Block 9 Tower
Block 9 is an 18-story mid-rise, mixed-use tower in the heart of downtown Fargo. The 234 feet tower transformed the downtown skyline as the tallest
Block 9 is an 18-story mid-rise, mixed-use tower in the heart of downtown Fargo. The 234 feet tower transformed the downtown skyline as the tallest
The University of Missouri Health Care (MU Healthcare) constructed the new consolidated women’s and children’s hospital on its main campus. This new 323,400 square foot
Vandalia Tower, a former Mattress Factory, was redeveloped into a diverse 200,000 square foot community of artists and creative users which included a brewery, broadcast
The Memorial Union at the University of North Dakota has served as the heart of the campus since its first event in 1951. In 2018,
Built in 1926, this design-assist renovation transformed 33 antiquated teaching labs and three lecture halls into vibrant, flexible workspaces to bolster instruction, research, and support
Nicollet Commons reopened in July 2021 with some repairs and enhancements to the existing water features and splash pad. Our teams were brought in as
This design-build project was a multi-phase, multi-year expansion and included multiple additions totaling approximately 55,000 square feet. The additions included a central utility plant, a
Legacy Lofts, a design-build 1M square foot, multi-unit residential building located in downtown Minneapolis, MN housed 374-pre-wired condos totaling 700,000 square feet of livable space
The Butler Square Atrium renovation included 30,000 square feet of renovation to this 9-story, historic office complex. The project consisted of complete removal and replacement
The renovation and expansion of the Philips-Wangensteen Building was designed to be a state-of-the-art facility to transform health education in Minnesota, making the U of
Built in just 28 months, this design-assist 585,000 square foot, 6-story, 194 bed adult and children’s hospital was a multi-story healthcare campus with two towers,
Construction on this 337,400 square-foot sports facility located on the East Bank of the Minneapolis University of Minnesota campus began in April 2016 and was